Noticias de la compañía
nuevos productos
  • Licencia de software XBR-G6MIDR12PTPOD-32G
    Licencia de software Brocade XBR-G6MIDR12PTPOD-32G BR-MIDRMFEB-01-Z para conmutador HD-G620-24-32G

    Marca Brocade Licencia PN XBR-G6MIDR12PTPOD-32G Licencia Interior PN BR-MIDRMFEB-01-Z Lugar de origen Malasia Factor de forma F/S Interior SFP: 8 piezas 32G 850nm SW Active Brocade HD-G630-48-32G interruptor Temperatura de caja de gama baja ( °C) 0 °C Temperatura máxima de la caja (°C) 70°C Diagnóstico Digital Transmisor VCSEL Receptor PIN Voltaje Suministro 3.3--5v Conector Dual LC Garantía 1 año Condición nueva DDMI Sí Tiempo de entrega Dentro de las 24 horas Paquete Paquete original Brocade

    Lee mas
  • Conmutador de fibra óptica G720-64-32G-F
    24/64 puertos Brocade G720 Switch G720-64-32G-F Interruptor de fibra óptica

    El conmutador Brocade G720 es un conmutador Gen 7 con 64 puertos en un diseño de 1U ultradenso. Con un rendimiento 64G inigualable y un 50 % menos de latencia en comparación con la generación anterior, este conmutador ofrece un componente básico de puerto fijo diseñado para maximizar el rendimiento de los entornos flash y NVMe para cumplir con las cargas de trabajo exigentes. Con la tecnología Brocade Gen 7, Brocade G720 ofrece mucho más que mejoras en la velocidad y la latencia. Puede eliminar el dolor de administrar su centro de datos, con tecnología SAN autónoma para ofrecer una red que puede autoaprender, autooptimizarse y autorrepararse sin intervención.

    Lee mas
  • QDD-400G-ZRP-S
    Transceptores ópticos QDD-400G-ZRP-S 400G ZRP compatibles

    Descripción del producto Este transceptor QSFP-DD compatible con MSA proporciona un rendimiento 400GBase-ZR Open ZR+ a través de fibra monomodo (SMF) utilizando una longitud de onda coherente y un conector LC. Está diseñado según los estándares de MSA y está serializado de forma única y probado en aplicaciones y tráfico de datos para garantizar que se integren en su red sin problemas. El soporte de monitoreo óptico digital (DOM) también está presente para permitir el acceso a los parámetros operativos en tiempo real. Este transceptor cumple con la Ley de Acuerdos Comerciales (TAA). Respaldamos la calidad de nuestros productos y ofrecemos con orgullo una garantía limitada de por vida. Los transceptores de ProLabs cumplen con RoHS y no contienen plomo. TAA se refiere a la Ley de Acuerdos Comerciales (19 USC y 2501-2581), cuyo objetivo es fomentar el comercio internacional justo y abierto. La TAA requiere que el gobierno de los EE. UU. adquiera únicamente “productos finales fabricados en los EE. UU. o designados en un país.

    Lee mas
  • SFP 1.25G FR 15km
    Compatible Mikrotik XS+2733LC15D SFP 1.25G FR Modo único 1270nm+ 1330nm 15km Transceptores ópticos

    El kit contiene dos módulos SFP+ que se pueden usar como un par para lograr una velocidad de datos operativa de hasta 25 Gbps para distancias de hasta 15 km con un solo cable óptico. Las unidades SFP/ SFP+/ SFP28 están probadas y son compatibles con RB260GS, RB2011LS, RB2011LS-IN, RB2011UAS-IN, RB2011UAS-RM, RB2011UAS-2HnD, RB2011UAS-2HnD-IN y CCR1036-12G-4S. Las unidades también son compatibles con dispositivos SFP que no son de MikroTik. Detalles Código de producto Conector XS+2733LC15D Tasa de datos UPC de LC única Distancia 1G / 10G / 25G Formato de 15 kilómetros Modo SFP/SFP+/SFP28 Longitud de onda monomodo 1270nm + 1330nm

    Lee mas
  • QSFP+ 10G SR 15km
    Transceptores ópticos Mikrotik XS+2733LC15D 10G QSFP+ SR compatibles

    El kit contiene dos módulos SFP+ que se pueden usar como un par para lograr una velocidad de datos operativa de hasta 25 Gbps para distancias de hasta 15 km con un solo cable óptico. Transceptores ópticos SFP/ SFP+/ SFP28

    Lee mas
  • BR6505-24-8G-R/BR6505-24-16GR/BR6505-24-16GR/6505-24-0-R
    12/24 puertos Compatible Brocade BR6510 Gen 5 Fibre Channel 1U Switch BR6510-24-8G-R/BR6510-24-16GR/BR6510-24-16GR/6505-24-0-R Interruptor de fibra óptica adecuado para 57-1000117-01 /57-1000027-01/57-0000080-01/57-0000088-01/57-0000089-01

    12/24 puertos Compatible Brocade BR6510 Gen 5 Fibre Channel 1U Switch BR6510-24-8G-R/BR6510-12-8GR/BR6510- 24 -8GR Switch de fibra óptica Adecuado para 57-1000117-01/57-1000027-01/57 -0000080-01/57-0000088-01/57-0000089-01/57-1000487-01/57-0000089-01/57-1000488-01/57-1000262-01/57-1000489-01/XBR-000458 /XBR-000258/XBR-000499/XBR-000498

    Lee mas
Back to Full Operations: 2026 Lunar New Year Update

2026 / 02 / 24

Topstar has resumed normal business communication after the 2026 Lunar New Year holiday. For customers planning optical-network, server-memory, enterprise-SSD, network-adapter, switch, or AI-server projects, the period immediately after a holiday is a good time to reconfirm technical requirements, update delivery assumptions, and organise the documents that keep a purchase moving smoothly. This update explains how to prepare an efficient request for quotation and how to reduce avoidable delays during the return-to-operations period.

What “full operations” means for a project request

Returning to normal operations does not mean that every component is immediately available or that every route has the same lead time. Availability depends on the exact manufacturer part number, condition, quantity, stock location, required testing, and destination. The most useful first step is to send a complete request rather than a short product name. Include the approved part number, quantity, host platform, required delivery location, desired condition, and any compatibility or certification requirements. This lets the sales and technical teams compare the request against the correct stock and supplier channels instead of preparing a generic quotation that must be reworked later.

Update your bill of materials before requesting price

Many post-holiday projects begin with an old bill of materials that has changed during budgeting. Review every line item with the engineering or operations owner. Confirm the server model, switch model, port type, connector, interface generation, form factor, firmware or coding requirement, and included accessories. For a transceiver, identify the host device, speed, reach, fibre type, connector, and whether the link is a direct connection or part of a breakout design. For memory and SSDs, identify the exact platform bay, carrier, population rule, and part number. A clean bill of materials prevents substitutions that are physically similar but unsuitable for the installed system.

Provide information for a useful quotation

A quotation should make the commercial and technical scope easy to audit. State the legal purchasing entity, ship-to country, preferred Incoterms if your organisation uses them, currency, requested payment structure, and whether partial shipment is acceptable. Specify whether serial-number traceability, photos, test records, or special packing are required. For a pilot order, explain that the purpose is compatibility validation so that the supplier can quote a small, clearly defined sample. For a rollout, include the required delivery sequence by site or rack. These details help the supplier identify realistic options and help your team compare responses on the same basis.

Confirm compatibility before releasing a volume order

Compatibility should be confirmed at the system level. Optical modules must match the switch or NIC, speed mode, fibre path, and current firmware policy. Network adapters must match the server PCIe slot, power, airflow, operating system, and switch fabric. DDR5 server memory must match the platform’s approved memory type and population guide. Enterprise SSDs must match the bay, backplane, carrier, interface, firmware, and thermal design. If the configuration is new or business-critical, validate one sample in the target system before committing to volume. Record the test result, software version, and final approved part number for future purchasing.

Plan stock, testing, and shipment as separate stages

Do not treat “in stock” as a complete delivery plan. Ask whether the item is physically available, allocated, incoming, or subject to vendor confirmation. Then confirm whether compatibility coding, burn-in, lab testing, labelling, or special packing is required before dispatch. For international shipments, review the destination, consignee information, customs responsibilities, and any documents required by your organisation. A realistic plan identifies the latest acceptable dispatch date and the notification path if a line item changes. This gives the project manager a usable schedule without turning an estimate into an unconditional delivery promise.

Use the return to operations to review spares

The first weeks after a holiday are also a practical time to inspect spare inventory. Compare the installed base with available optical modules, DAC or AOC assemblies, power supplies, storage carriers, NICs, and memory modules. Confirm that the spare part number matches the deployed hardware and that the stored item has the correct form factor and connector. Keep serial-number and location records current. A small, approved spare inventory often reduces downtime more effectively than an urgent search after a failure, especially when a data-center team manages more than one hardware generation.

Set a communication and change-control process

Use one traceable channel for quotation revisions, technical questions, and shipping updates. Any change to the part number, quantity, payment beneficiary, ship-to address, or delivery terms should be confirmed through your procurement process. For multi-site or multi-rack projects, nominate one technical approver and one commercial approver. This prevents the common problem where a compatible alternative is discussed informally but never added to the purchase order. Keeping the final bill of materials, quotation, data sheet, test evidence, invoice, packing list, and tracking details together simplifies receiving and later warranty support.

Post-holiday project checklist

  • Refresh the exact bill of materials and remove obsolete or ambiguous part numbers.
  • State the host platform, compatibility requirements, condition, quantity, and destination for every line.
  • Confirm stock status, test requirements, packing, and dispatch assumptions separately.
  • Validate new configurations with a representative sample before volume purchase.
  • Maintain traceable records for the approved part, shipment, and installed asset.

Next step

Topstar welcomes new and continuing project enquiries as normal operations resume. Send the exact requirement and intended platform so that the quotation can be prepared around the real deployment rather than a generic product description. Final availability, compatibility, pricing, shipping, and warranty terms should always be confirmed for the specific order.

derechos de autor © 2026 Topstar Technology Industrial Co., Ltd..todos los derechos reservados. energizado por dyyseo.com

Chatea ahora

chat en vivo

Si tiene preguntas o sugerencias, por favor déjenos un mensaje, ¡le responderemos tan pronto como podamos!